On Saturday March 30, for our first workday , the project was to remove a brick wall from the basement as well as “energy enveloping” in the upstairs which means caulking all wood framing on the exterior walls and spraying foam into the larger gaps and openings. Tough work but our small and energetic and enthusiastic group got it done!   On April 20 our job for the day was demolition which meant taking the interior of the home “down to the studs” by removing drywall from walls and ceiling as well as removing the furnace. This included cleaning up  blown-in insulation which fell like snow as the ceiling was removed!